5 Years in constructions starts 2008 in 9th Malaysia Plan
Lunched by Prime Minister Datuk Seri Najib on 1 Mac 2014
RM 4 billion cost
24km total long 17m on the water
Nak bina susur keluar ke Pulau Aman, tapi penduduk kata; “Pulau Aman tak ada jalan, hanya laluan motosikal”
200 columns
300 tonnes load bagi satiap tiang
Guna kaedah ‘High Damping Natural’ yang terpanjang di dunia
tahan 7.5 Richter scale of shock Strong enough For earthquake every 500 years but not for 2,500 years (Cerucuk akan patah)
30 m tinggi tiang tengah yang boleh bergoyang mengikut gegaran
struktur jalan
30m untill 6m above sea level
Cable durability is 50 years and 120 years if in good conditions
Biggest Plaza Tol in Malaysia with 26 payment kiosks available capacity 10,000 vehicles per day
Surau and Plaza Tol, electric supply by Turbine